11,068,200ج: مقدم30% على10سنوات بدون خصم. عرض منفصل بخصم10% بسعر9,961,380ج: مقدم5%/4.5سنوات،10%/5،20%/6،30%/7. خصم15%: مقدم20%/5سنوات،30%/6،40%/7. خصم25%: مقدم25%/3سنوات. خصم الكاش40%. الصيانة10%. التسليم: على المخطط.
Ground-floor restaurant and cafe 48 sqm with 12 sqm outdoor in Triple Hub in Triple Hub
2nd District (Shorouk), Shorouk City
Installment
30%
10
Remaining
Overview
48 m²
Area0
Bedrooms0
BathroomsG
FloorDescription
A ground-floor restaurant and cafe in Triple Hub Mall by Gosour Developments, Shorouk City. The unit combines 48 sqm indoors with a 12 sqm outdoor area, giving your dining concept 60 sqm in total across indoor and open-air spaces. The price is EGP 11,068,200 under the 30% down payment and 10-year installment plan, without a discount.
📐 Technical Details:
• Activity: food and beverage, restaurant or cafe.
• Indoor area: 48 sqm.
• Outdoor area: 12 sqm.
• Combined indoor and outdoor area: 60 sqm.
• Floor: ground floor.
• Total price without discount: EGP 11,068,200.
• Main payment plan: 30% down payment over 10 years.
• Delivery classification: off-plan.
• Maintenance: 10% extra.
📍 Location:
Triple Hub is directly on Gamal Abdel Nasser Axis and Geneva Road in Shorouk City. Place your restaurant or cafe within a mixed-use commercial, administrative and medical destination connected to the surrounding Shorouk communities.
✅ Attraction:
• Ground-floor food and beverage activity with an indoor dining space and outdoor area.
• 12 sqm outdoors alongside the 48 sqm indoor unit.
• Commercial, administrative and medical uses within the same destination.
• A landscaped Green Plaza and dancing fountain within the project.
• Entertainment area of 1,500 sqm and a 3,800 sqm hypermarket within the project.
• Project management and operation by MRB.
• A 10-year installment option with 30% down payment, without a discount; shorter discounted plans are separate alternatives.
📋 Quick Facts:
Triple Hub | Gosour Developments | Shorouk City | Ground-floor restaurant and cafe | 48 sqm indoor + 12 sqm outdoor | EGP 11,068,200 without discount | 30% down over 10 years | Maintenance 10%.