Strip Way

Developers: Kayan Developments

Hadayek October, 6th of October

About Project

🏙️ Project Identity:
Strip Way Mall October Gardens — The Ultimate Open-Air Retail & Commercial Landmark Designed by ADC Consultant
Strip Way Mall (also branded as Palm Strip) emerges as a premier, ultra-modern open-air retail destination in the heart of October Gardens, masterplanned to redefine contemporary shopping and high-yield real estate investment. Engineered by the prestigious ADC (Architecture & Design Consultant), the project centers around an advanced "Strip Mall" layout concept, seamlessly blending smart indoor boutique spaces with massive open-air outdoor plazas. The architectural master plan enforces 5 primary operational design objectives: creating open leisure spaces, vast outdoor areas, total building accessibility for everyone, 99% open visual lines (View for Everyone), and ultimate ease of facility operation—making it the ideal ecosystem for international franchises, retail brands, and premium F&B hubs.

📍 Location & Unrivaled Catchment Power (The Commercial Core of October Gardens):
The lifestyle commercial complex enjoys a front-row, geo-strategic geographic placement within the high-density growth sector of October Gardens, acting as a vital lifestyle and commercial anchor:

Situated directly in the heart of October Gardens, positioned within immediate proximity to major luxury compounds, national residential complexes, and academic institutions, locking in a non-stop, built-in daily consumer footfall (High Traffic).

Located just minutes away from major transit axes, including the Italian District Road, Al Betrol Square, and Zewail University, ensuring smooth commuting fluidity and high long-term property asset appreciation.

📐 Project Layout & Precise Strip Floor Analysis (Technical Data):
According to the official structural layouts and data certified by ADC, the commercial footprints have been masterfully optimized to capture absolute consumer exposure:

Ground Floor Commercial Plan (Detailed Spatial Analysis):

Total Indoor Shop Area: 746.80 m².

Total Designated Outdoor Plaza Area: 457 m².

Current Spatial Unit Allocation (Indoor / Outdoor Dimensions):

Shop 01: Premium corner layout featuring 69.20 m² Indoor + 33.5 m² Outdoor.

Shop 02: Optimized configuration featuring 58.50 m² Indoor + 31.5 m² Outdoor.

Shops 03 to 05: Structured with inner layouts of 69.20 m², 67.80 m², and 66.50 m² respectively, all sharing a fixed 31.5 m² Outdoor space.

Shop 06: High-visibility unit featuring 65.20 m² Indoor + 38.5 m² Outdoor.

Shop 07: Commanding the largest open deck with 53.20 m² Indoor + a massive 42 m² Outdoor area.

Shops 08 to 11: Ideal retail footprints featuring a standard 46.60 m² Indoor space, paired with dedicated outdoor spaces ranging from 31.5 m² to 34 m².

📐 Financing Tracks, Zoning & Functional Execution:

Strategic Brand Zoning: The mall layout is pre-engineered to host critical anchor tenants ensuring heavy daily traffic, including a large supermarket chain (Metro), a flagship pharmacy, premium dining/cafe concepts (Mochitito, Bistro, Coffee Shop), and versatile lifestyle retail boutiques.

Flexible Purchasing Plans: Highly liquid, long-term financing tracks are available, structured with initial down payments and extended equal installment schedules tailored for high corporate investment returns.

✅ Attractions & Premium On-Site Amenities:

Double-Height Panoramic Glass Facades: Contemporary, visually striking exterior storefronts that optimize brand visibility and ensure maximum visual capture for passing traffic.

The Palm Strip Landscape Aesthetic: Elegantly landscaped pedestrian promenades lined with manicured palm trees and open event plazas, creating a relaxing, resort-style retail environment.

Operational Facility Infrastructure: Fully fitted with high-efficiency centralized cooling frameworks, smart automated fire detection/suppression networks, and modern luxury public restrooms across all levels.

Smart Security & Logistics: Supported by non-stop 24/7 CCTV surveillance networks, professional on-site security personnel, electronic building access gates, comprehensive underground parking structures, and independent loading/unloading bays to keep street traffic flowing smoothly.

Pricing & Payment

Starting Price
4,000,000 EGP
Payment Method
Cash + Installment
Down Payment
5%
Installment Years
10
Installment Status
Remaining

Available Units

No specific units listed yet. Contact for info.

Listing Agent

SestoEstate Team

Verified Listing

Send Inquiry

Loading available times...

Property Disclosure: The undersigned acknowledges viewing the property through the SestoEstate platform and the real estate consultant. This acknowledgment is an official document of the platform's connection to the process. The buyer undertakes not to bypass the platform for direct dealing with the owner.