Developer: Al Waheed Developments (headed by Eng. Waheed Osman with over 15 years of industry experience). Architecture & Concept: Modern, fully integrated residential compound designed to maximize privacy with optimal building spacing, high-end contemporary elevations, balanced distribution between built-up structures and open green landscapes, and isolated facility zones. Total Layout & Structure: Spans 8 feddans featuring residential buildings with diverse apartment layouts, serviced hotel apartments, lush green landscapes, and smart internal street networks. Overall Theme: Upmarket, quiet, and eco-friendly modern living destination in September / October Gardens.
📐 Technical Details & Payment Plan:
Master Plan & Unit Breakdown: 1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Serviced hotel apartments. Finishing Standards: High-grade exterior and interior building specifications with full legal title documentation finalized. Payment Plan & Terms: Flexible payment structure starting with a 10% down payment and installments up to 10 years; Launch discount up to 15%. Scheduled Delivery: Phased delivery timelines according to project construction schedule.
📍 Location:
District: Hadayek October, directly situated on Al-Wahat Road, adjacent to New Korba Compound. Proximity & Connectivity: 5 minutes from Fayoum Road; 15 minutes from the Regional Ring Road, Waslat Dahshur, Media Production City, and Mall of Egypt; 20 minutes from the 26th of July Corridor and El Hosary Square; 22 minutes from Giza Pyramids; 25 minutes from the Grand Egyptian Museum (GEM); near major academic institutions (Zewail City, 6th of October University, MSA University).
✅ Attractions:
Extensive green spaces and landscape vistas, smart electronic gates, open family gathering areas, integrated commercial district with dining and retail outlets, outdoor sports and jogging tracks, fully secured kids' play area, on-site medical center, pharmacies, and supermarket, 24/7 security with trained personnel and full CCTV coverage, underground parking garages, automatic fire extinguishing systems, backup power generators, and full facility maintenance.